Larsen & Toubro
- Monthly Inspection of electrical hand tools
- Quarterly Inspection of temporary electrical systems
- All the Electrical equipment will be checked on regular basis
- “Green Card” system will be followed for all electrically operated equipment’s / hand tools
- Prepare electrical single line diagram, schematic diagram and the details of the equipment for all temporary electrical installation and these diagrams together with the temporary electrical equipment shall be submitted to the PMC Engineer for necessary approval.
- Conduct monthly electrical safety audit with PMC Engineer representative shall covering the following and submit the report to DFCCIL.
- Electrical accidents investigation findings and remedy
- Adequacy of power generation and power requirements
- Power distribution and transmission system in place
- Updated electrical single line diagram showing the current condition of power source and distribution including the IP44 DBs arrangement.
- Electrical protection devices – selection, installation and maintenance.
- Earth or ground connection and earth pit maintenance details
- Education and training of electrical personnel undertaken
- Routine electrical inspection details
- Electrical maintenance system and register.
- Name plate details of major electrical equipment
- Classified zones in the site, if any.