
JSW Sports
Job Description
1.Preparation of Design Criteria for coal projects.
2. Preparation of Process Flow Diagram with mass balance for coal projects.
3. Review of PID of Washery.
4.Review of GA drawings of building and process equipment.
5.Preparation and review of Equipment list and its specifications and load list.
6.Preparation of RFP/tender documents for consultancy works and EPC packages.
7. Preparation of technical queries against the proposals received for evaluation.
8.Preparation of cost benefit analysis of the proposed modification.
9. Preparation of Operating expenditures for all bid projects involving coal.
10. Reviewing the engineering progress of process plants and monitoring to avoid delays